Delivery

PRD: structure and examples

How to make a useful PRD: the context of the problem, goals, constraints, scenarios, metrics, risks and open questions.

PRD is not needed to formally start development, but to align solutions between product, design, analytics and engineers. A good document captures the problem and limits, but leaves the team room to choose implementation; its scope depends on the risk and irreversibility of the solution.

Why you need PRD in Delivery

The role of PRD in the delivery process

PRD sets out what needs to be done and what the outcome should be. This is a single point of truth for a product: developers, testers, analysts, and designers read the same version of the requirements. When the product enters the implementation phase, a competent PRD keeps the focus of the entire team and protects against spontaneous changes.

Example

In practice, they often do this: take PRD before the start of the sprint, spend a short walkthrough with the team. The result is less detail questions during the sprint review, more predictable quality.

Key PRD Structure for Efficient Delivery

Main sections of PRD

Delivery often relies on such a PRD framework:

1. Goals and context

Why is a product or feature being developed? Clearly articulate what business and user challenges new opportunities solve.

2. User Stories and Scripts

PRD is useful to structure through user stories: specific use cases, priorities, user restrictions. This approach simplifies the work in the implementation phase.

3. Acceptance Criteria (Acceptance Criteria)

Clear, measurable conditions under which a task will be deemed to have been completed. The Given-When-Then (Gherkin) approach helps describe the criteria clearly and clearly for the team.

4. Limitations and non-functional requirements

Restrictions on technical implementation, quality standards, timing, compatibility. These are not details for architects, but an important part of avoiding invisible risks.

5. Validation and Success Metrics

How do you know the problem is solved? Describe the key metrics and validation processes of the solution (testing, pilot, A/B test).

Example: Improvement of the mobile application

For example, the registration screen is updated. PRD includes business purpose (reduce registration time by 20 seconds), user story (new user quickly registers using email and social networks), acceptance criteria (registration from all browsers without bugs, no longer than 30 seconds), restrictions (works on Android 10+ and iOS 14+), success metric (95% of users go through the process without errors).

Typical errors and anti-patterns

Frequent problems

One of the main problems is the vagueness of the requirements. If the PRD formulates the tasks of “speeding up” without numbers, the team does not know what to do. Another anti-pattern is the addition of requirements on the go, which blurs the testing and quality control processes.

How to avoid

Always agree PRD with the team at the pre-meeting, do not move to development until the acceptance criteria and case test are clear. Separate the mandatory from the desirable: if something is “nice to have”, put it in a separate section so that the team does not waste resources.

Examples of templates and best practices

Useful leads:

  1. List of user stories and acceptance criteria in table form. This visualizes the dependence of tasks and checklist of tests.
  2. Keep going back to the original metrics: If a solution doesn’t affect the metrics you choose (e.g., lowering API response time), it goes beyond delivery.
  3. Use checklists for acceptance: each task is closed only after passing all points.

PRD templates are described by Atlassian and in the Product Coalition guide.

Quality control and finalization of PRD

Why check the result with PRD

Before handing over the feature, it is important to go through the acceptance criteria and the list of requirements. If the criteria are not formalized, there are bugs, holes in logic and long deadlines. The Delivery team spends resources on patches instead of product development.

Example

Ficha is embedded and poured into production. Before the release, the team does a QA walkthrough on PRD. If 1-2 points are not passed, they are returned to work, saving time on the future update.


Questions about PRD

What distinguishes a good PRD in Delivery from a regular one? Clear objectives, formalized acceptance criteria, lack of ambiguity, clear use cases and quality metrics.

**Is it possible to make a minimum PRD for quick releases? Yes, if the scope of work is small, but the key requirements and acceptance criteria must be prescribed.

Who is responsible for maintaining and maintaining PRD? Usually the product manager or the owner of the functionality, but the coordination always occurs with the development team and QA.

What tools do you use to run a PRD? Confluence, Notion, Google Docs, templates from Atlassian. It is important to have a single source that the entire team has access to.

**How do you make sure the team understands the PRD correctly? Conduct a short walkthrough or grooming session before the start of work, fix open questions and answers in the document itself.

**How often do you update your PRD on the go? Any change in requirements is recorded in the current version of the PRD with a date and context stamp (e.g. due to new dependency).